Float or carry the first section into position.
Rest the post foot firmly on the lake bottom.
Now, side load the top end of the vertical pipe into the post brackets.
Tighten the setscrew in the post bracket to lock the dock frame on the pipe.
Repeat steps 1-3 for each dock section, locking into the hook bracket from the previous section.