Step 1

Float or carry the first section into position.

Step 2

Rest the post foot firmly on the lake bottom.
Now, side load the top end of the vertical pipe into the post brackets.

Step 3

Tighten the setscrew in the post bracket to lock the dock frame on the pipe.
Repeat steps 1-3 for each dock section, locking into the hook bracket from the previous section.